West Arunta Carbonatite Exploration Strategy
ASX ANNOUNCEMENT
31 July 2024
Carbonatite Exploration Strategy
Nexus Project, West Arunta
Australian Potash Limited (ASX: APC or the Company) is pleased to provide the following preliminary review
of exploration targeting at its 100% owned Nexus Project (Project) in the highly prospective carbonatite niobium rich West Arunta region of Western Australia. Successful exploration for niobium rich carbonatite
intrusions across the West Arunta has been led by modelling of gravity and magnetic survey anomalism, with
carbonatites typically comprising dense rocks and minerals which can generate gravity and magnetic ‘highs’.
Highlights
•
Processing and interpretation of open-file magnetic, radiometric and elevation data, as well as
surface geology maps suggest Neoproterozoic host rocks favourable for niobium-REE carbonatite and
iron-oxide-copper-gold (IOCG) mineralisation in the northern portion of the Project
•
Broad spaced gravity data indicates anomaly highs coinciding with prospective Neoproterozoic
bedrock: gravity anomalies are typical of WA1’s Luni and Encounter Resources’ Emily and Crean
deposits
•
On-ground rock-chip, geochemical sampling and gravity and magnetic surveying to effectively
identify drill target sites for niobium-REE carbonatites and IOCG deposits now planned on completion
of pending Land Access agreement
Figures 1 & 2: APC’s West Arunta Nexus Project tenements over a filtered gravity colour image on top of a filtered magnetic image,
highlighting regional gravity anomaly highs coinciding with an outcropping to sub-cropping belt of prospective Neoproterozoic
bedrock over a 25-kilometre strike length. This area will be the initial focus for non-invasive on ground exploration following successful
agreement with the traditional owners, the Kiwirrkurra People, for Land Access.
Location
The Nexus Project sits in the West Arunta region of Western Australia, approximately 630kms to the west of
Alice Springs. Located 80kms south-west of WA1 Resources Ltd (ASX: WA1) Luni Niobium deposit and 80kms
south of Encounter Resources Ltd (ASX: ENR) Crean & Emily carbonatite-Niobium deposits and proximate to
Rincon Resources Ltd (ASX: RCR) Avalon and Pokali prospects. The Nexus Project covers an area of 660km2,1.
Gravity Anomalism
Analysis of widely spaced gravity data indicates the presence of regional gravity anomaly highs. These
anomalies are associated with an outcropping to sub-cropping belt of promising Neoproterozoic bedrock.
The accurate targeting and subsequent discovery of the Luni Niobium deposit (Inferred MRE 200Mt at 1.0%
Nb2O5 including high-grade 53Mt at 2.1% Nb2O5 2 ) followed, among other things, ground gravity surveys
conducted using 400m x 400m station spacing data points 3.
Open-file survey data collected using station spacing of 2.5km x 2.5km did not accurately identify the Luni or
P2 carbonatite intrusions.
On grant of EL application 80/6043 & 80/6044 per ASX announcement 24 July 2024 ‘West Arunta Acquisition’
WA1 Resources Ltd ASX Announcement 1 July 2024 ‘West Arunta Project – Luni MRE’
3
WA1 Resources Ltd ASX Announcement 16 November 2022 ‘West Arunta Project – Discovery of a Second NiobiumREE Mineralised Carbonatite System at Luni.
1
2
Australian Potash Limited (ASX:APC)
Page 2 of 6
Australian Potash Limited (ASX:APC)
Page 3 of 6
Figures 3, 4 & 5: APC’s West Arunta Nexus Project tenements relative to WA1 Resources Ltd’s Luni deposit, Encounter Resources Ltd’s
Aileron, Crean and Emily deposits and Rincon Resources Ltd’s Pokali and Avalon targets over regional scale 2.5km x 2.5km gravity
data
This understanding of the discovery pathway for REE-carbonatite mineralisation in the West Arunta will be
useful to the Company on concluding the Land Access agreement with the traditional owners, the Kiwirrkurra
People, and suggests low impact mapping, rock chipping and ground gravity surveying as initial work
programs.
At a minimum, on-ground gravity surveys on 400m x 400m grid spacings, across the initial area of interest as
well as comprehensive rock chipping, soil sampling and geological mapping will be planned.
Magnetic, Radiometric and Elevation Data Review
Processing and interpretation of open-file magnetic, radiometric and elevation survey data as well as statewide surface geology maps suggest sub-crop/outcrop of Neoproterozoic hosts rocks favourable for niobiumREE carbonatite and IOCG mineralisation in the northern portion of tenements E80/6044 and E80/5917. A
thorough review of historical exploration in the area has commenced.
This outcropping to shallow bedrock below young sedimentary cover further supports an initial on-theground geological reconnaissance and mapping, rock chip and soil geochemical sampling program to
effectively identify target zones for niobium-REE carbonatites, IOCG deposits and other styles of
mineralisation. In addition, follow-up detailed ground gravity and drone magnetic geophysical surveying is
anticipated ahead of any proposed drilling program.
Any anticipated on-the-ground exploration work would be preceded by close engagement and consultation
with the traditional owners and would have to be facilitated by the Land Access Agreement discussed here.
Australian Potash Limited (ASX:APC)
Page 4 of 6
Land Access Agreement for Prospecting and Exploration
The Company has been advised that it may be extended an invitation to present to the traditional owners of
the country in the West Arunta, the Kiwirrkurra people, at the planned September 2024 meeting of the Tjamu
Tjamu (Aboriginal Corporation) RNTBC (Tjamu Tjamu). On the assumption that APC and Tjamu Tjamu are
able to mutually agree on the terms of access it is anticipated that a binding agreement will be executed
shortly after the September meeting.
This release was authorised by the Managing Director & CEO of the Company.
Matt Shackleton
Managing Director & CEO
m.shackleton@australianpotash.com.au
+61 (0) 438 319 841
Michael Fry
Company Secretary
m.fry@australianpotash.com.au
+61 (0) 417 996 454
About APC
APC holds a 100% interest in the West Arunta Nexus Project (Nexus), located approximately 1,000kms eastsoutheast of Port Hedland in Western Australian. Comprising of two exploration licenses across an area of
660km2 Nexus is an early stage exploration opportunity surrounded by globally significant and emerging rare
earth and critical mineral element deposits. The West Arunta is WA’s most exciting exploration frontier with
strong potential to hold sedimentary, IOCG, SEDEX & carbonatite hosted mineral deposits.
APC holds a 100% interest in the Lake Wells Gold Project (LWGP), located approximately 500kms northeast
of Kalgoorlie, in Western Australia's Eastern Goldfields. Forming part of the project areas on listing the LWGP
was held under an earn-in joint-venture by a third-party between 2018 – 2022. The opportunity to
consolidate the data set generated during the JV with existing data has generated a new exploration model
with several untested, highly prospective targets.
APC holds a 100% interest in the Laverton Downs Project (LDP), located 5kms north of Laverton, in Western
Australia's Eastern Goldfields. The LDP is prospective for nickel and other base metal sulphides and is located
in the prominent gold bearing Lancefield sequence trending north of Laverton town site.
Please visit www.australianpotash.com.au for more information.
Competent Person Statement: The information in this announcement that relates to Geophysical Results is
based on information compiled by Sharna Riley who is a Fellow of the Australian Institute of Geoscientists, is
employed by Resource Potentials Pty Ltd, and an independent consultant to the Company. Miss Riley has
sufficient experience which is relevant to the style of mineralisation and deposits under consideration and to
the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
“Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Miss Riley
consents to the inclusion in the announcement of the matters based on this information in the form and
context in which it appears.
Cautionary Note Regarding Forward-Looking Statements and information: Certain of the statements and
information in this announcement that are not historical facts are forward-looking statements. Forwardlooking statements are statements that are not historical and consist primarily of projections — statements
regarding future plans, expectations and developments. Words such as “expects”, “intends”, “plans”, “may”,
“could”, “potential”, “should”, “anticipates”, “likely”, “believes” and words of similar import tend to identify
forward-looking statements. All forward-looking statements are subject to a variety of known and unknown
risks, uncertainties and other factors that could cause actual events or results to differ from those expressed
or implied, including, without limitation, business integration risks; uncertainty of production, development
Australian Potash Limited (ASX:APC)
Page 5 of 6
plans and cost estimates, commodity price fluctuations; political or economic instability and regulatory
changes; currency fluctuations, the state of the capital markets, uncertainty in the measurement of mineral
reserves and resource estimates, the Company’s ability to attract and retain qualified personnel and
management, potential labour unrest, reclamation and closure requirements for mineral properties;
unpredictable risks and hazards related to the development and operation of a mine or mineral property that
are beyond the Company’s control, the availability of capital to fund all of the Company’s projects and other
risks and uncertainties identified under the heading “Risk Factors” in the Company’s continuous disclosure
documents filed on the ASX. You are cautioned that the foregoing list is not exhaustive of all factors and
assumptions which may have been used. The Company cannot assure you that actual events, performance
or results will be consistent with these forward-looking statements, and management’s assumptions may
prove to be incorrect. The Company’s forward-looking statements reflect current expectations regarding
future events and operating performance and speak only as of the date hereof and the Company does not
assume any obligation to update forward-looking statements if circumstances or management’s beliefs,
expectations or opinions should change other than as required by applicable law. For the reasons set forth
above, you should not place undue reliance on forward-looking statements.
Australian Potash Limited (ASX:APC)
Page 6 of 6
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
JORC Code explanation
Commentary
Samplin
g
techniqu
es
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g
charge for fire assay’). In other cases,
more explanation may be required, such
as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Not applicable
Drilling
techniqu
es
Drill
sample
recovery
• Not applicable
• Not applicable
Criteria
JORC Code explanation
Commentary
Logging
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of
bias) and precision have been established.
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Not applicable
Subsampling
techniqu
es and
sample
preparati
on
Quality
of assay
data and
laborator
y tests
Verificati
on of
sampling
and
assaying
• Not applicable
• Not applicable
• Not applicable
Criteria
JORC Code explanation
Commentary
Location
of data
points
• The GDA94, MGA Zone 52 co-ordinate
system was used for representing
locations and data in this report.
Sample
security
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been
applied.
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
• The measures taken to ensure sample
security.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• Regional interpretation of publicly available
gravity and magnetic data has been quality
controlled by external consultants.
Data
spacing
and
distributi
on
Orientati
on of
data in
relation
to
geologic
al
structure
• Existing regional ground gravity data is
based on 2.5km x 2.5km spacings and
airborne magnetic data has survey line
spacing of 400m and 100m.
• Not applicable
• Not applicable
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
JORC Code explanation
Commentary
Mineral
tenemen
t and
land
tenure
status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
• Acknowledgment and appraisal of
exploration by other parties.
•
•
•
•
• Deposit type, geological setting and style
of mineralisation.
• Not applicable
Explorati
on done
by other
parties
Geology
E80/5778
E80/5917
E80/6043 (Application)
E80/6044 (Application)
• Not applicable
Criteria
JORC Code explanation
Commentary
Drill hole
Informati
on
• A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
• If the exclusion of this information is
justified on the basis that the information is
not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
• In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• These relationships are particularly
important in the reporting of Exploration
Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (eg ‘down
hole length, true width not known’).
• Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
• Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.
• Not applicable
Data
aggregat
ion
methods
Relation
ship
between
mineralis
ation
widths
and
intercept
lengths
Diagram
s
Balance
d
reporting
• Not applicable
• Not applicable
• Not applicable
• Not applicable
Criteria
JORC Code explanation
Commentary
Other
substanti
ve
explorati
on data
• Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
• The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
• Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
• Not applicable
Further
work
• Not applicable
Share your feedback
Discover